Case Study

Riverdale Country School

Riverdale Country School

Pages 2 Pages

To meet the tight project deadlines, we developed innovative contractual terms that allowed us to start preliminary production prior to receiving a final approval from DOB. Route surveys completed for transporting steel beams indicated that the largest trailer delivery could be 32’ long and not exceed 12’ wide. We chose Flex as an ideal solution as it was within the delivery size criteria and also met the requirements of the New York City DOB for classroom use. After spending hours on the local roads researching routes, actual bridge height and street measure- ments, we found a route that would cut delivery trips in half by allowing larger loads to reach the site than previously thought possible. RIVERDALE THE STORY Instructional 9,440 ft 2 6 Months Solution Type Scope of Proj

Join for free to read