Case Study

River Tame, Middleton Hall

River Tame, Middleton Hall

the River Restoration Centre Case Study Series This site was last visited by RRC staff on 18 th December 2008 Tel/fax: 01234 752979 Email: rrc@therrc.co.uk http://www.therrc.co.uk River Tame, Middleton Hall Technique: To enhance a uniform, straight channel by creation of central islands Project location: River Tame, Middleton Hall River: Tame County: Staffordshire Project start date: August 1998 Project end date: September 1998 Length: 500m Cost: £25,000 Upstream grid reference: SK 206 001 Site background The Tame is a lowland river flowing to the east of Birmingham. At this section the Tame flows in a straight, featureless channel through a gravel workings and is flanked by

Join for free to read