Case Study

River Itchen Bank Repairs

River Itchen Bank Repairs

RIVER ITCHEN BANKS R i v e r I t c h e n B a n k R e p a i r s Under Land and Water Services (LAWS) framework contract with the Environment Agency, LAWS provided design and build services for the reinstatement of river banks affected by winter flooding in Easton, Orvis & Fulling Mill, Winchester on the River Itchen. Soft engineered designs were the preferred option on the SSSI designated sites. An active water vole population and ripar

Join for free to read