Case Study

Riga Airport

Riga Airport

Pages 1 Pages

Riga Airport City Riga Country Latvia Construction period 2013-2014 The upgrades HOCHTIEF Solutions has been contracted to perform at Riga Airport between May 2013 and August 2014 were quite extensive: two new halls, new taxiways and de-icing platforms, refurbishment and drainage of the takeoff and landing strips and the runways, extension of the apron, runway and apron lighting. Riga’s is already the most vital airport in the Baltic region; the upgrade increased its capacity and improved safety standards to make Riga a hub for Northern European air traffic in the long term. Operations continued uninterrupted during the 16-month construction period.

Join for free to read