Case Study
Riel Park Playing Field Drainage
Prefabricated system enhances drainage and venting. In April 2009, the City of St. Albert opened the first phase of the Riel Recreation Park Redevelopment which included a new high-end artificial turf multipurpose field. Challenge The recreation park was formerly a dry waste landfill site from 1976 to 1986. A system was needed to allow for quick drainage under heavy rainfall conditions, while at the same time allowing for unobstructed v