Case Study

Rheinwerk 3, Bonn, Germany, 2015

Rheinwerk 3, Bonn, Germany, 2015

Rheinwerk 3, Bonn, Germany, 2015 Rheinwerk 3 is a premium office facility located in the former German capital Bonn. With its unique location at the River Rhine at the “Bonner Bogen”, the architecture and equipment of the building, and the comprehensive infrastructure, Rheinwerk 3 is one of the most attractive locations in and around Bonn. The use of most modern technology allows to implement resource-saving energy concepts, as confirmed by the DGNB gold certificate. Lighting, sun blinds, and energy supply can be controlled conveniently and individually from a PC. All conference rooms are equipped with comfortable touch panels. (Reference: https://www.rheinwerk3.de/en) The building automation system has been implemented by Kieback & Peter (subsidiary Köln). Kieback & Peter used LOYTEC prod

Join for free to read