Case Study
Revu From Bid To Closeout With CCI Mechanical
© Copyright 2019 Bluebeam, Inc. www.bluebeam.com REVU FROM BID TO CLOSEOUT WITH CCI MECHANICAL CHALLENGES Communication gaps to the field can create a detrimental impact to a project’s critical schedule, team productivity, and turnover and maintenance for the owner. As a design-build mechanical contractor firm that is involved with design, installation, turnover and maintenance of mechanical systems for commercial and industrial facilities, these communication gaps needed to be eliminated at each step from the office to the field, as well as within project partnerships and owner turnover. SOLUTIONS CCI Mechanical used Bluebeam ® Revu ® at every stage of project delivery for the Grove Tower commercial office building project to generate improved dialogue between their engin