Case Study
Reviewing The Floor System Of A South Asian Airport
Design Assessment Reviewing the floor system of a South Asian airport www.bre.co.uk Three causes of cracking and curling – Failure to properly design movement joints – Use of fibre reinforcement in place of steel mesh reinforcement – Not allowing the screed to dry out fully before tiles are laid For more information contact Rupert Pool: T: +44 7800 622926 E: poolr@bre.co.uk W: www.bre.co.uk When newly-laid screed in a new airport termina