Case Study
Retrofits Have HUGE Impacts
(p) 800.711.5428 | www.convergentwater.com Retrots Have HUGE Impacts Retrotting Low Impact Development into an existing parking lot can have huge impacts on a watershed. With a 90% reduction in peak ow combined with the 3,500 gallons of water that is captured, the Aguirre & Fields parking lot reduced the discharge rate leaving the site to the predevelopment condition. This means water leaving the site now has no net impact on the water