Case Study

Øresund Link and Roxtec

Øresund Link and Roxtec

Pages 8 Pages

Øresund Link is the name of the 16 km long combined bridge and tunnel connection between Malmoe in Sweden and Copenhagen in Denmark. Modern bridge and tunnel construc- tions contain advanced system equipment for signalling and electri- cal power, with many openings for routing of cables and pipes that need to be sealed. Safety demand is primarily for the protection against fire, weather and wind, and to secure EMC. The stated fire rat

Join for free to read