Case Study

Replacing the Multistage Centrifugal Blowers with APG-Neuros Turbo Blower and Resulted in an Efficiency Gain of 22.7%

Replacing the Multistage Centrifugal Blowers with APG-Neuros Turbo Blower and Resulted in an Efficiency Gain of 22.7%

Pages 1 Pages

CASE STUDY APGN-MK-CS-009 Case Study: San Bruno Water Quality Control Plant (WQCP), South San Francisco, CA Replacing the multistage centrifugal blowers with APG-Neuros’ turbo blower resulted in an efficiency gain of 22.7% The Water Quality Control Plant (WQCP) replaced one of its multistage blowers with a new APG-Neuros turbo blower. The new turbo blower supplies the majority of aeration for one of the trains in

Join for free to read