Case Study
Renovation of Hotel Alte Post, Tirol (AT)
Vibration-isolating loating loor for heavy trafic areas Maintenance-free sound insulation for permanent domestic and working comfort Cost beneit from quick and easy installation Case Study Renovation of Hotel Alte Post, Tirol (AT) Sound Insulation for a Multi-Purpose Building Description of the project In renovating the Hotel Alte Post in Arzl, Tyrol, Getzner was tasked with installing impact noise insulation for heavily-used loors. As