Case Study

Renewable Energy Power Station: Cutting Edge Composite Trench Covers for Cutting Edge Renewable Energy Power Statio

Renewable Energy Power Station: Cutting Edge Composite Trench Covers for Cutting Edge Renewable Energy Power Statio

Pages 3 Pages

Renewable Energy Power Station Cutting Edge Composite Trench Covers for Cutting Edge Renewable Energy Power Station Garreg Lwyd wind farm under construction Project Overview Under the EU’s renewable energy plan (still in place post- Brexit) the UK set targets to meet 15% of their energy needs from renewable sources by 2020, including generating 30% of electricity from wind, solar and other low carbon sources (The Guardian, 2016). Wales selected 7 SSAs (Strategic Search Areas) in Wales chosen for good wind speeds and lack of statutory designations. One of these was selected as a site for Garreg Lwyd large scale wind farm, which will be capable of providing su cient renewable electricity to meet the average needs of more than 26,000 homes. The project consists of 17 turbines, a control buil

Join for free to read