TRS Project Manager: Mr. Joe Sturza TRS Project Engineer: Mr. Greg Beyke, P.E. Site Geology and Hydrology: Interbedded clay, silt and sand with a complex series of stacked aquifers and perched water zones; perched groundwater from 18 to 39-ft bgs Treatment Area Size, Volume, and Depth: 13,200ft 2 , 30,000 yd 3 , and 35 to 95-ft bgs Average Beginning Contaminant Concentrations: 15,000 µg/l of TCE in groundwater Remedial Goal(s): Remove as much TC