Case Study

Remedial Investigation

Remedial Investigation

Remedial Investigation at a Superfund Site Case Study: Multilevel Sampling and Monitoring, Maryland, USA Challenges Volatile Organic Compounds contaminated the groundwater posing a risk to nearby private water supply wells. The traditional approach of drilling and sampling multiple boreholes did not provide adequate data to characterize groundwater flow and contaminant migration in the complex fractured bedrock. Solution Westbay System* was insta

Join for free to read