Case Study
Refit (Multi-Site)
The Bridgford Building Wellington Crescent Fradley Park Lichfield Staffordshire WS13 8RZ Tel : - 01543 443200 www.bridgford.co.uk Retail Refit (Multi-Site) 28 stores run by Game / Electronic Boutique were refitted by Bridgford Interiors between July and September 2002. 3 Projects were completed each week with the team on site for 3 days and nights for each store. Working across a number of sites simultaneously is required for both refurbishment schemes and roll out initiatives. Works are generally undertaken in trading stores overnight or in close down periods. Whichever method is used, works are required to be properly planned to mitigate disruption to trade. Fast track programmes allow the Retailer to retain consistent brand image across the portfolio.