Refinery - Secondary Containment Hazgard Lining System

Refinery - Secondary Containment Hazgard Lining System

Refinery - Secondary Containment Hazgard Lining System LOCATION: Edmonton, AB Suncor Edmonton Refinery, formerly Petro Canada Refinery TIMEFRAME: October 2010 – March 2011 SCOPE OF WORK: Supply and Install Secondary Containment Lining System PROJECT PARTNERS Owner: Suncor Energy Engineer: TWD Technologies Contractor: CPI Construction Installation: Layfield Environmental Material supplier: Layfield Environmental Challenge In March 2009 we were forwarded a Request for Information from Amy Woods (SSR) from our Vaughan o ce. The request came from TWD Technologies an engineering rm that we had worked with previously. The project was to install a lining system within a steel containment system for the containment of ethanol. The di culty with the project was that the 3.20 meter (10.5 foot) hi