Case Study

Reducing Costs and Improving Reliability for Dense Phase Limestone Transport System

Reducing Costs and Improving Reliability for Dense Phase Limestone Transport System

Pages 2 Pages

Reducing Costs and Improving Reliability for Dense Phase Limestone Transport System January 13, 2016 Result Eliminated $1,000,000 in trucking expenses and increased overall system reliability by designing and supporting the implementation of a continuous dense phase system. The project was completed on time and the trucking contract was cancelled two months after start-up. The solution met savings and reliability improvement goals. Challenge The client’s original dense phase limestone transport system (traveling between a grinding mill and a shingle manufacturing plant) could not meet production requirements. As a result, 25% of the limestone requirement was being trucked to the plant at a cost of over $1,000,000 per year. EFI Group was engaged to increase transport system capacity