Case Study

Reduce Energy Costs

Reduce Energy Costs

Operational Since January 2003 REGEIS CARE CENTER With the facility operating around-the-clock, Regeis Care Center’s energy needs were substantial. Aegis installed 150kW’s of cogeneration to provide a significant portion of the building’s electrical and thermal needs. Before cogeneration was installed, the facility was using electricity to meet its sizable demand for space heating and air conditioning. With th

Join for free to read