Case Study

Redi-Liner Dual Durometer Ceramic - Flow & Anti-Wear - Hill View Quarries, Dromana, Victoria, Australia - Granite rock

Redi-Liner Dual Durometer Ceramic - Flow & Anti-Wear - Hill View Quarries, Dromana, Victoria, Australia - Granite rock

Pages 1 Pages

REDI-LINER DUAL DUROMETER CERAMIC MODULAR LINING SYSTEM CASE STUDY PRODUCT: PRODUCT CATEGORY: LOCATION: CONVEYED MATERIAL: EXISTING WEAR LINER INSTALLED: RATE: INSTALLATION DATE: PROBLEM DESCRIPTION: Redi-Liner Dual Durometer Ceramic Flow & Anti-Wear Hill View Quarries, Dromana, Victoria, Australia Granite rock, 15” (400mm) Abrasion-resistant steel plate 350 tons per hour, 8 foot (2.5m) drop 14 months to date This customer in Australia was originally dropping granite lumps 8 feet onto a 60° panel protected by a 5 /8”-thick bisalloy plate. This plate was only lasting 5 days, requir- ing a shutdown to replace it weekly. First, a solid 2” polyurethane wear panel was tested, which lasted 3 days. Next, an Argonics dual durometer ceramic Redi-Liner panel was tested. This 12” x 12” x 4” panel

Join for free to read