Case Study

Redi-Liner Ceramic Modular Lining System - Gold mine in Durango, Mexico - Crushed ore

Redi-Liner Ceramic Modular Lining System - Gold mine in Durango, Mexico - Crushed ore

Pages 1 Pages

REDI-LINER TM CERAMIC MODULAR LINING SYSTEM CASE STUDY PRODUCT: LOCATION: CONVEYED MATERIAL: RATE: INSTALLATION DATE: DESCRIPTION: Redi-Liner Ceramic Modular Lining System Gold mine in Durango, Mexico Crushed ore, 1 /2” (13mm) and smaller 1,324 tons per hour April 2019 A gold mine in Durango, Mexico installed two Argonics Redi-Liner Ceramic panels alongside two rubber ceramic panels in the discharge chute of a transfer conveyor. After one month, the panels were compared. The Argonics panels showed much less wear than the rubber panels. The customer was extremely happy with the performance of the Argonics panels and has decided to enter them in their system as the standard for all the transfer conveyors at the leach pad. 520 9th Street Gwinn, MI 49841 906.226.9747 800.991.27

Join for free to read