Case Study

Redevelopment London UK

Redevelopment London UK

Richard Brewer / Construction Director / Readie Construction Ltd. / Unit 15 Falcon Business Centre / Ashton Road /  Romford / Essex RM3 8UR / Tel. +44 (0) 1708 332 800 / www.readieconstruction.co.uk  Gareth Leonard / District Manager / Regenesis Ltd. / The Tramshed / Beehive Yard / Walcot Street / Bath BA1 5BB / Tel.  +44 (0) 1225 731 446 / www.regenesis.com   Placing the BOND Layer  Finished Surface showing BOND Layer  Sealing around Steel Stanc

Join for free to read