Case Study

Redeveloped Efficiently

Redeveloped Efficiently

Pages 2 Pages

ALLPLAN ENGINEERING IN PRACTICE For all those involved in the project, repairs to the 12-kilometer section of the A2 freeway between Stansstad and Beckenried is a particular challenge. Be- tween 2013 and 2017, the section of road, which has been in use for 40 years, will be redeveloped in three construction stages at a cost of around 278 million francs. The 12-kilometer section of road will be redeveloped in three stages: the first stage in M

Join for free to read