Case Study

Red Power Air Handling Unit

Red Power Air Handling Unit

Pages 1 Pages

SUCCESS STORY RED POWER © OPTIBELT 2016 www.optibelt-usa.com 800-292-6081 PROBLEM These belts needed to be replaced every 6 months (on average) because of failing/slipping due to lack of proper maintenance and difficult accessibility. SOLUTION Optibelt RED POWER KraftBand RESULTS By directly replacing the existing belt with RED POWER, the AHU experienced a dramatic increase in belt life and performance. The switch also el

Join for free to read