Case Study

Rebuild Facility

Rebuild Facility

Pages 1 Pages

BHC Current Process: Chemistry: 515 DD Concentration: 3% Temperature: 150 o F (65.6 o C) Time: 5 minute wash Rinse Water Temp: No rinse Rinse Water Number and Time: N/A Dry: N/A Tank Life: 30 to 60 days Results: No flash rusting, parts have 30 plus days with out rusting Reason BHC Won: 515 DD provided better cleaning results, no flash rusting, longer bath life X2 Customer’s Previous Process: Previous Chemistry: ChemStation Spray Wash Concentrat

Join for free to read