Reality Modeling Drives Communication of Design Intent for Mobile River Bridge Project

Reality Modeling Drives Communication of Design Intent for Mobile River Bridge Project

Pages 2 Pages

Bentley LumenRT Helps ALDOT Reduce Animation Production Time by 70 Percent on Second Highest Clearance Bridge in the United States Fast Facts • ALDOT is proposing the design of the country’s second highest bridge with a 215-foot vertical clearance to alleviate congestion and increase capacity along the I-10 corridor. • The new six-lane cable-stayed bridge will replace the George C. Wallace Tunnel, which is expected to generate significant economic benefit for the State of Alabama and the local community. ROI • Using Bentley LumenRT helped reduce animation production time of the project by 70 percent. • LiveCubes generated with Bentley’s visualization and reality modeling software.