Re-Location - Re-Design

Re-Location - Re-Design

Challenge: • Client’s old plant used eddy current separators for non-ferrous waste. • System was under-performing and needed to be re-located and re-designed. Axion solution: • Axion re-designed a new plant layout using existing ECS units and added one reconditioning unit. • The plant was rebuilt using 35% scrap materials. • On-site performance tests were conducted. • The plant was subject to optimisation on performance and ef?ciency. Res