Case Study
Rated Six Out Of Five
CASE STUDY: RATED SIX OUT OF FIVE 18585 Samuels Road | Zachary, LA 70791 | 225.658.6166 | thompsonpipegroup.comBACKGROUND Contractor S. J. Louis Construction needed a pipe supplier for the Upper Rowlett Sanitary Sewer Force Main Project in Allen, Texas. The direct-bury and two- pass installation called for approximately 10,000 linear feet of 42” diameter pipe and fittings for straight runs, terrain and curves. The project specifications