Case Study

Rapid response to a complex job

Rapid response to a complex job

Pages 2 Pages

Engineering and construction experts, VolkerStevin, were called in to deal with a major road landslip in the North East, with complicated ground conditions, on a Site of Special Scientific Interest (SSSI). They called on our pump and plant hire teams in Middlesbrough and Newcastle to work on the job. Rapid response to a complex jobOn top of the restrictions that come with such a site, we encountered failure of a retaining wall, running sand over sandstone artesian springs, a major influx of groundwater and boggy conditions. As the main thoroughfare into Rothbury, with live utility services running into the town, gas electricity and telecoms were at risk. Recognising the urgency of the situation, our Pump Hire specialists used the latest pump technology – bringing in brand new additions to

Join for free to read