Rain for Rent Overcomes Bad Weather Conditions While Keeping Safety First PUMPS • TANKS • FILTRATION • PIPE • SPILLGUARDS 800 742 7246 rainforrent.com BACKGROUND A waste water treatment plant in Ohio needed to bypass their interceptor sewer line so that the existing system could be redirected into a new facility. The massive bypass would need to handle 50 MGD of sewage and be completed in challenging weather conditions including up to 18-inches of mud. OUTCOME Rain for Rent’s system design and attention to detail surpassed the competition’s plan for a turnkey bypass. The system utilized a combination of 16-inch electric and diesel driven pumps and instrumentation, which enabled the construction contractor to rehab the interceptor line. HIGHLIGHTS • 50 MGD of combined sewer overfl