Case Study
Rail Rolling Stock to Sierra leone
The client A leading minerals company developing a world class iron ore deposit and its associated rail and port infrastructure in Sierra Leone. The challenge We were tasked with shipping 600 rail wagons and 20 flat wagons from their point of production in China to an iron ore development in Sierra Leone. The wagons were required to transport iron ore from mine site to port and were critical to the ongoing development and operation of the