Case Study
Rail Bridge
During refurbishment of a UK rail bridge in winter, heavy snow, extended cold periods and a continuous flow of water from concrete above the bridge beams, made it impossible to use an ordinary coating system. Preparatory blasting work in many areas was beginning to show significant re-rusting because of the delays in coating. The contractors, with expensive scaffolding and other infrastructure in place, were anxious to avoid any further de