Case Study
Radisson Hotel, Guildford
Galliford Try engaged CGL to value engineer the 3 storey basement construction for the new Radisson Hotel in Guildford. The project was originally conceived by others as a secant wall construction with piled foundations. This did not take advantage of the ability of chalk to withstand steep excavation in the temporary condition or recognise the water levels identified by the original investigation. CGL worked closely with the structural eng