Case Study

R&M Solutions – a Reliable Basis for the IT Infrastructure of the Mariinsky Palace

R&M Solutions – a Reliable Basis for the IT Infrastructure of the Mariinsky Palace

Pages 1 Pages

Olga Tysyachnyuk | Project Manager Synergia SE, Ukraine olga.tysyachnuk@synergia.ua Olga Tysyachnyuk | Project Manager Synergia SE, Ukraine olga.tysyachnuk@synergia.ua 050.6235 050.6703 090.7275 R&M Solutions – a Reliable Basis for the IT Infrastructure of the Mariinsky Palace After the opening, the President of Ukraine, together with the First Lady, held an official diplomatic reception attended by heads of diplomatic missions of foreign countries and in - ternational organizations accredited in Ukraine. The Mariinsky Palace was built in 1752 in Baroque style by the architect Bartolomeo Rastrelli and today it is one of the most valua- ble architectural monuments of Ukraine. After the proclamation of Ukraine’s independence in 1991, the Mariinsky Palace became the official residen

Join for free to read