Case Study
Quickflange Modification to Fuel Gas System
Case Study Quickflange do Brazil Mar 2015 CS Achievements Within 2 days, the client was able to deliver a unique solution, without welding/hot- work, thus saving time, reducing risk and maximising efficiency. This in turn ensured that an additional work scope 17 x 2” Quickflange installation on a stainless steel system could also be completed afterwards. These were installed and testing in 2 days. Quickflange Modificati