Case Study
Quality control
Case Study Reduced Downtime Quality control Challenge The customer was having failures in the field during their fracturing process on Dual Belt Loaders and Sand King units due to a lack of maintenance. The failures included belts breaking, sidewall tears, leaks on motors, worn out bearings and hydraulic leg issues. Solution Lewis-Goetz created a quality check form to cover the main issues, and dispatched a two-man crew to the customer’s yar