Case Study
QGC Water Group
Independent Pipeline Solutions Project Profile Client: QGC Water Group Scope: Dewatering of Orana 3 Pond – Temporary Infrastructure Scope included: • Construction of 800 m of 315mm HDPE pipeline; • Hydro-test and QA of constructed pipeline; • Construction of earth bridge to allow continued pond access; • Installation of 3 x Matador 4” submersible pumps along with associated generators and fuel cells • Operation of pumps including on-call troub