Case Study
PX Wilton Raw Water Pipeline
CLEAN WATER REHABILITATION – civils@seymourcivil.co.uk www.seymourcec.co.uk Project Description: The scope of works involved the construction of 1,500m of new raw water pipework from the existing Northumbrian Water Limited (NWL) Conduit 74 to the Cooling Water Return Channel within the TPS Site. Pipes laid: Approximately 1300m of 710mm OD HPPE (SDR 17) with butt fusion welded joints, constructed below ground across level open farml