Case Study
Pumps required lifting and cleaning at least a few times every month.
? Pumps required lifting and cleaning at least a few times every month. ? Difficult location meant parking on the Highway, and craning over a ditch to gain access and lift the pump. ? Toby Rinehart, Superintendent of Public Services, attended WEFTEC 2017 and won a free installation in a competition. ? The week after WEFTEC 2017, a unit was installed and commissioned. ? It was set with Real Time Pump Protection TM to prevent ragging and keep the pump running clean. Deragger Inc. 1220 Main St, Suite 400, Vancouver, Washington, 98660 (360) 215-7676 info@deragger.com www.deragger.com ? Since installation in October 2017, the lid of the station has not been lifted once. ? Ragging eliminated by DERAGGER TM +. ? Safety improved as Highway access is no longer required to lift