Case Study

Pump refurbishment and coating

Pump refurbishment and coating

Pages 1 Pages

Case study: Pump refurbishment and coating Refurbishment and coating of a five-stage p10 accelerator pump. Client Major oil & gas operator. Application date August 2007. Scope of work Pump received in parts, following strip and wash to remove LSA scale. Wetted areas pre and post-machined. Coated using Corroglass 600 Series. Assembled and checked for free rotation. Pressure tested @ 80 psi for 30 minutes. Products Corroglass 600 series. Plasmet ZF

Join for free to read