Case Study

Project: Kupe Gas Onshore Facility New Zealand

Project: Kupe Gas Onshore Facility New Zealand

Locker Heatshielding Ltd, Farrell Street, Warrington, WA1 2WW, United Kingdom sales@lockergroup.com Tel: +44 (0)1925 406600 Fax: +44 (0)1925 444386 Project: Kupe Gas Onshore Facility New Zealand Locker Heatshielding Ltd were contacted by Technip Oceania in 2008 to assist with protection of flare gas supply pipework and flare air ducting located at the Kupe Gas onshore terminal. These flares are positioned in a specially designed burn pit to prevent damage to any surrounding infrastructure. Due to the horizontal orientation of the flare tips, the Heatshields had to provide full protection to both the equipment and support structure, as there could be a tendency for the flares to blow back in the direction of the Heatshield wall. The shields also needed to fit in close

Join for free to read