Case Study
Project: Bumi Armada – Olombendo FPSO
Locker Heatshielding Ltd, Farrell Street, Warrington, WA1 2WW, United Kingdom sales@lockergroup.com Tel: +44 (0)1925 406600 Fax: +44 (0)1925 444386 Project: Bumi Armada – Olombendo FPSO Locker Heatshielding Ltd were contacted in July 2015 by Bumi Armada Berhad regarding their Heatshield requirements for the Olombendo FPSO which was to be situated in Angola Block 15/06 East Hub Field. The FPSO specified design life is 20 years and therefore the Heatshields were required to be designed for in excess of this timescale. Deliverables BS EN ISO 9001:2008 Certificate No Q 05104 This project required the shielding of 3 separate modules and the swivel turret from the effects of the radiant heat being produced from the close proximity of the Flare boom. Each module was to be c