Case Study

Process Glycol Chilled Water System

Process Glycol Chilled Water System

Evaluation and upgrade of a process glycol chilled water system serving a biopharmaceutical manufacturing facility. Design included computer-based flow simulations and analysis of various operating scenarios based on process functions. Modifications included the installation of a primary- secondary variable speed pumping system with PLC based instrumentation, controls and devices for controlling variable loop flows, temperature and press

Join for free to read