Case Study

Problematic Substrate

Problematic Substrate

Pages 1 Pages

QBM Solutions Case Study - Problematic Substrate Location: Blackburn, Lancashire Client: Willmott Dixon Contractor: Lancashire Date: October 2012 Requirement - To fix heavy galvanised topat section to concrete substrate Problem / Issue - • Specified fixing unsuitable for the application intended • Unreliable concrete substrate • Shallow rebar at a depth of 50mm • Embedment depth required for specified product greater than

Join for free to read