Case Study
Prince Edward Theatre Replacement Air Conditioning London, UK
Copyright © 1976-2015 BuroHappold Engineering. All Rights Reserved A BREATH OF FRESH AIR FOR PRINCE EDWARD THEATRE CLIEN T Delfont Mackintosh Theatres Ltd PROJECT VALUE Confidential DUR AT I O N 2015 - 2017 SERVICES PROVIDED BY BURO HAPPO LD Building services engineering, asset management, sustainability consultancy The Prince Edward Theatre was built in 1930 and became a cinema in1954 before being converted back into a theatre in 1978. Although fully refurbished in1991, with further renovations carried out since, in 2015 it was identified that the building services infrastructure in the theatre was tired and no longer providing adequate fresh air conditions for the occupants, creating a less than comfortable audience environment. BuroHappold Engineering was invited to r