Case Study
Prime Tower, Zurich
Prime Tower, Zurich Flexible configuration for the highest building in Switzerland LEED Gold-certified building provides heating and cooling with Kampmann trench heating Client: Swiss Prime Site AG, Olten, Switzerland Project data: Prime Tower, ZurichLocation: 8005 Zurich, Switzerland Features Katherm HK trench heating provides demand-led heating and cooling from the oor throughout the entire building complex. The complex consists of a total of four buildings including the 126-metre high Prime Tower, the highest building in Switzerland. The high-rise o ce building received four top environmental awards: LEED Gold, Leadership in Energy and Environmental Design, Minergie®, greenproperty and the Credit Suisse AG mark for sustainable building. Alongside standard trenches, custom-built Kath