Case Study
Premier Packaging , Inc.
ENERGY INTEGRATED SOLUTIONS +1 (404) 937-6547 | www.EnergyIntegratedSolutions.com EIS originally insured the project savings at 12.8%. After 5 months of operation, the project was providing savings of 17.3% and had completely eliminated the Power Factor Penalty. This amounted to a 35% improvement over the amount insured by EIS and a significant improvement over the original 34-month payback period.