Case Study
Prefabricated Daycare Modular Building
Prefabricated Daycare Modular Building Baltimore, MD The Challenge A Hospital was in need of daycare space but there was no room inside the building. There was a sloped piece of land on campus that the building could be constructed and connected to the main campus by corridor. The Solution Modular Genius constructed a foundation for the modular GZNQINSLTSYMJMNQQFSIGZNQYY T RJJYYMJXUJHN?HSJJIXUJW code. A 1,440 sqft modular building was built delivered and installed on site in approximately 90 days from contract to completion. modulargenius.com 888-420-1113