Case Study

Predicting Failures in a Wind Farm

Predicting Failures in a Wind Farm

Pages 3 Pages

Presenso Case Study: Predicting Failure s in a Wind Farm Building 15 MATAM Industrial Park Haifa, Israel. Email: info@presenso.com Phone: +972.4.9821199 Predicting Failures in a Wind Farm 1 BACKGROUND For wind farms, minimizing Operations and Maintenance (O&M) costs is of critical importance. On average, O&M accounts for up to 30% of the cost per kWh produced over the life of each wind turbine.

Join for free to read