Case Study

Prague Metro

Prague Metro

Pages 2 Pages

After the flooding of 19 stations in 2002 Prague has set out on a vast project of rebuilding and refurbish- ing the metro system. Roxtec has been chosen to supply water-tight, gas-tight and fire-proof seals for the tunnel sections. Previously Prague Metro were using compounds as sealing solution. As from now they upgrade to Roxtec. Requirements include 90 minutes of fire endur- ance, and chemical resistance. The most frequent cable dia

Join for free to read